Monthly Maintenance; External Maintenance - Amann Girrbach PL900S Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 43
C L E A N I N G A N D M A I N T E N A N C E
C/L nozzles
E N
Do not clean the C/L nozzles with the col-
let brush!
▷ Inspect the C/L nozzles weekly.
▷ If required, clean the outlet hole using a fine,
flexible needle.
Fig. 19 Cleaning the C/L nozzles
40
8.3

Monthly maintenance

Checking the zero point
It is recommended to check the zero point once
every month. To start the zero-point check:
▷ With the door shut, select the
tion
function at the operational display.
▷ Follow the instructions on the display.
8.4

External maintenance

External maintenance is necessary after a defined
number operating hours. The milling machine
software will display an appropriate message.
Service/Calibra-

Publicité

Table des Matières
loading

Table des Matières