Mounting The Main Unit - Cresta Care DTX690 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NOTES:
First insert the batteries of main unit, then insert the batteries of the outdoor sensor in
3 minutes after the main unit is powered on, to assure of the sensor data received
well.
In case of the outdoor sensor data received failure, pls press ALARM key for more
than 3 seconds to synchronize the RF signal.
Every time the batteries are replaced , the main unit will loose all the weather data.
Every time the batteries are replaced , the thermo-hygro sensor should sychronize
with the main unit again, please press the key ALARM for more than 3 seconds to
synchronize the RF signal.

Mounting the main unit

The main unit can be placed onto any flat surface or wall mounted at the desired
location by
Hanging hole, It is important to check that the radio signal can be received before
mounting.
Mounting the outdoor sensor onto the stainless steel mast
For accurate results, the outdoor sensor mast should be securely mounted onto a
horizontal surface and in an open area away from trees and other coverings where
rainfall or wind speed may be reduced to cause inaccurate reading.
Mounting the wind speed sensor to the first plastic bracket:first check the wind-fan can
rotate freely before fixing , then the wind speed sensor should be mounted onto the

Publicité

Table des Matières
loading

Table des Matières