Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Preparing the barrier
Remove the two screws on the top dome, fit the key into the lock and turn it counter clockwise .
Lift the dome and remove the inspection hatch .
⚠ Warning! The barrier is set up for installing on the left.
When installing on the right, invert the boom's opening direction, as follows:
- remove the anchoring pin from the lever arm ;
- release the gearmotor by using the key;
- turn the lever arm by 90° ;
- lock the motor again;
- fasten the anchoring pin to the opposite hole on the arm ;
- invert cables M with N and FA with FC .
Left
Right
PT F FC FA
N
M
4
1
3
2