Setting The Gas Flow Rate - Abicor Binzel ABIPLAS WELD 100 POWDER W Mode D'emploi

Masquer les pouces Voir aussi pour ABIPLAS WELD 100 POWDER W:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation

6.5 Setting the gas flow rate

EN - 16
Bleed the entire cooling system as follows when used for the first time and after
every cable assembly replacement:
1 Disconnect the coolant return hose (1) from the coolant recirculator (3) and
hold it over a collection receptacle.
2 Seal the opening on the coolant return hose (1) then re-open it by abruptly
releasing it. Repeat this process until the coolant flows into the collection
receptacle continuously and without air bubbles.
3 Switch off the coolant recirculator (3) and reconnect the coolant return
hose (1).
NOTICE
• The type and amount of the gases to be used depends on the welding
task. Only pure inert gases or their mixtures may be used as plasma gas.
 Tab. 4 Process gases type 100/150 according to DIN EN ISO 14175
on page EN-6
• Make all shielding gas connections gas-tight.
• Small amounts of condensation may form in the shielding and plasma
gas hoses after long periods of non-use or following high temperature
fluctuations. Detach the wear parts and remove the residues by actuating
the gas test trigger until the shielding and plasma gases are dry. Perform
this procedure every day prior to starting work.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly before connecting
the cylinder. This will expel any impurities that may be present.
1 Connect the plasma, shielding and propellant gas.
2 Set the gas flow rate.
 Tab. 4 Process gases type 100/150 according to DIN EN ISO 14175
on page EN-6
®
ABIPLAS
WELD 100/150 POWDER W
BAL.0086 • 2021-08-19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Abiplas weld 150 powder w

Table des Matières