Certificação Solar Keymark; Environmental Protection; Final Notes; Programmed Maintenance - Pleion EGO Smart.Solar.Box 110 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
the manufacturer.
The GUARANTEE is not valid and operational if the
components are not paid for as indicated in the contract.
The GUARANTEE is not valid and operational if the
components have not been paid by the end user.
Environmental
protection
All the material used to produce the "EGO or EGO
PRIME" solar collector with integrated storage can be
recycled.
When scrapping the solar collector, send the accessories,
packaging, etc. to a recycling centre.

Final notes

The solar collector with integrated storage is produced in
a state-of-the-art manner regarding safety, in compliance
with what is indicated by laws in force.
When correctly assembled, installed and used respecting
these instructions, they do not endanger the safety of
people, animals and things.
Products covered by EU directives comply with the
essential requirements that the directives contain. Being
marked, these products can be placed on the European
Union markets without any further formalities.
Certificação Solar
Keymark
The EGO and EGO PRIME integrated solar collectors
have been certified by Solar Keymark according to the
Rev. 4.0 del 16|03|2022
test report issued by ENEA, as well as certified by Kiwa
Cermet Italia.
Programmed
maintenance
Even programmed maintenance must be
carried out by a qualified company; the
manufacturer will not recognise any
guarantee rights if done by other people.
Periodically check (at least once a year) the correct func-
tioning of the safety and non-return valve and the bypass
valve, because in the case of water that is particularly hard
and/or has a high impurity content, there could be loss of
sealing and jamming of the valve with serious conse-
quences for the integrity of the accumulation tank.
In this case it will be necessary to:
- install a softening or filtration device upstream from the
system;
- carry out adequate cleaning and if necessary, replace
the valves.
Have the electrical connection of the resistors checked to
make sure they are in good condition.
The manufacturer will not recognise any
guarantee rights if the "EGO or EGO
PRIME" solar collector with integrated
storage malfunctions because mainte-
nance was not carried out or was carried
out badly, in particular on the safety and
one-way valve, the backflow preventer
and the electric resistors.
52
FRANÇAIS
www.pleion-group.com
53
www.pleion.it

Publicité

Table des Matières
loading

Table des Matières