PLEASE READ THESE INSTRUCTIONS THOROUGH-
LY BEFORE INSTALLATION
I
GENERAL WARNINGS
Any claims made after final installation for damages
that could have been identified and repaired before
installation are excluded from our warranty.
As the general sale conditions establish that return of the
goods is ex-works Valvasone (province of Pordenone), Jacuzzi
Europe S.p.A. accepts no liability deriving from damages sus-
tained during transport or intermediate warehousing. As soon
as you receive the spa, it is therefore important to check that
the packaging is in perfect condition and if not, immediately
notify the forwarding agent.
Prolonged sun exposure could damage the material of
which is made the spa shell, due to its capacity to absorb
heat (dark colours in particular). Don't leave the spa to sun
exposure without adequate protection when not in use
(cover thermal, gazebo, etc.).
Any damage arising by not following these warnings are
not covered by the guarantee.
i
Remove the spa from the packaging and remove the front
panels (
). First unscrew the screws at the base (detail
5
1) and then slide out the panels from the threaded pins (de-
tail 2). The corner panels must not be removed.
If the MaxiJacuzzi is supplied with a wooden outer cover, for its dis-
i
assembly and re-assembly (after the final positioning of the tub),
refer to
.
6
i
For all transport operations use only the pallet on
(
1)
which the spa is placed. During installation support it by us-
ing only straps of adequate capacity, that can be inserted in-
to the runners and brackets at the bottom of the spa. After
final installation, these brackets can be removed and kept for
any future handling.
If it is impossible to use transport belts, the methacrylate pan-
els screw-fitted at the four corners can be removed so that the
corner props can be used as supports for moving the spa.
NOTE: this type of movement must be performed with
extreme care and the customer or its representative must
assume full responsibility for it.
Jacuzzi Europe S.p.A. accepts no liability for damages
caused by said operation or any other inappropriate han-
dling procedures.
CAUTION
NEVER lift the spa by its edge or by its pipes.
Carefully inspect the spa before proceeding with installa-
tion, checking the correct position of the couplings, pipes
and clamps (check that they are not loose).
I
INSTALLATION
Your spa has been designed so that the only requirements
for operation are connection to the electricity mains, earth,
drain outlet and water mains, all previously prepared (see
the attached "Pre-Installation Instructions").
To create a suitable support base, the gross weight must be
considered (when water and persons are added) and the re-
sulting load on the floor, depending on the selected model
See the attached pre-installation sheet.
i
spa
(
2) The
is equipped with a drain valve located roughly on
the centreline of the base. Therefore, a drain must be located n-
earby (see the attached "Pre-Installation Instructions").
For periodic emptying, a hose can be connected to the drain.
To do so, first remove the plug on the base and then screw on
the fitting with its gasket
1
3
4
Notes
To open the valve, turn the ring nut counter-clockwise and pull.
If you decide to attach the
connect upstream from the valve (for greater flow capacity) and
i
to install a shutter valve near the drain in an accessible area
(
2, part. D).
CAUTION
If for periodic filling the
ity mains that provide drinking water, contact local
authorities first in order to ascertain compliance
with anti-pollution laws in each nation. For EC coun-
tries, refer to standard EN 1717.
For connection to the electrical mains, refer to the in-
structions in the pre-installation sheet and the chapter "Elec-
trical connections". Please remember that the mains circuit
breaker must be located in an area that is safe and accessi-
ble to the user.
Electrical connections
Make the connection on the terminal board as shown in
4-4b.
32