First Start-Up - Jacuzzi andros Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

N N O O T T E E : : if power is supplied with a double line (380-415V 2N)
before making the connection you will need to remove the
jumper in the electrical box as per the instructions and di-
agrams in the installation manual.
For the characteristics of the cables, switches etc., consult the
pre-installation sheet provided, in particular the chapter on
ELECTRICAL SAFETY.
To ensure the degree of protection against water as required
by standards, a cable clamp has been installed to make con-
nection the electrical system easier.
The installer must in any case connect the phase wire to the correct
terminal and the neutral wire to terminal N (in the order indicated). He
must also connect the earth wire to the terminal identified by the sym-
bol
, taking care not to damage the components in the electrical box.
When installation is complete, the cable clamp must be closed and the
cover of the electrical box must also be hermetically closed.
Models with the "PERFORMANCE" filtering group (spa-
pak) : the power cable must be connected to the junction box
provided. The pump of the spa-pak, the spa pump, and the elec-
trical control box of the spa will also be connected to it.
NOTE: using this type of connection, the spa-pak pump will
operate at the same time as the spa pump when it is running
at low speed. When the spa pump is run at high-speed (hy-
dromassage), the spa-pak pump will remain off, with a signif-
icant reduction in the flow rate of water to the sand filter. If in-
tensive use of the spa is expected, it is suitable to provide sep-
arate electric power to the spa-pak so that external filtering can
be performed even when the hydromassage is turned on.
In any case, please refer to the respective installation manual.
The cable path, choice of materials and most suitable in-
stallation solutions are left to the professional knowledge
and experience of the installer; it is his responsibility to guar-
antee and certify the installation.
JACUZZI EUROPE S.p.A. denies all responsibility:
If installation is carried out by personnel unqualified and/or u-
nauthorised to certify the work carried out.
If current norms and legal provisions regarding the electric
systems of buildings in the country in which installation is car-
ried out are not complied with.
If the instructions for installation and maintenance contained
in this manual are not followed.
If unsuitable and/or uncertified materials are used for installation.
The spa is not installed in compliance with the above provi-
sions.
If incorrect operations are performed that reduce the level of
protection of the electrical equipment against water jets, mod-
ify the protection against electrocution due to direct or indirect
contact, or produce abnormal conditions of insulation, current
leakage or overheating.
If any components or parts of the appliance are altered in re-
lation to the original state when supplied, releasing the Man-
ufacturer from any liability.
If the appliance is repaired by unauthorised personnel or if s-
pare parts are used other than the original ones supplied by
Jacuzzi Europe S.p.A.
INSTRUCTIONS FOR USE AND OPERATION
FOR THE SYSTEM MANAGER
I

FIRST START-UP

Remove the
thermal cover
Check that the filter cartridge (or cartridges) is(are) present
in its container and that the cover is firmly closed (see the chap-
ter on "maintenance of the cartridge filter").
NOTE: For models with the "Performance" filtering group (s-
pa-pak), The cartridge filter must be removed as the filter ac-
tion is ensured by the spa-pak.
Check that the drain valve (
NOTE: if it has not already been installed, take the plug out
of the bag of accessories and screw it into the drain valve.
Check that all the hydromassage intakes are open.
Fill the spa up to the level mark on the skimmer (
tail A).
Filling will be performed as decided beforehand by the
customer (see pre-installation sheet, "Preparation for in-
stallation" chapter).
If you use the hose for garden work, let water run for
a while before filling the MaxiJacuzzi. This will elim-
inate stagnant water in the hose along with any bac-
teria that may cause irritations.
Turn on the all-pole circuit breaker located on the power
supply line (see the chapter and "Electrical Connections"
safety).
Notes:
- When first turned on, all of the numbers and LEDs on the
control panel will turn on. Following, the display will show the
codes for the software and firmware versions.
- In general, when the spa is filled for the first time, the water
temperature is lower than the set point set by the factory 35
°C). For this reason, the circulation pump and heater are
turned on. In any case the control panel will display the tem-
perature of the water in the tub.
- If the message "FLO" appears on the display, the pressure
switch/flow switch of the heater may be faulty. Please see
chapter "Abnormal operating conditions - Alarm signals".
33
of the spa.
i
2, detail C) is closed.
i
2, de-