6401553.book Seite 40 Montag, 13. Juni 2016 4:27 16
7 Conditioning
40
Operating Instructions BA ULTIMATE POWER + / BA ULTIMATE
For further processing, BA ULTIMATE POWER + / BA
ULTIMATE should be dry and free of residue.
3. Blow BA ULTIMATE POWER + / BA ULTIMATE out with max. 3 bar.
4. Maintain mechanical parts manually [ → 43].
5. Maintain the push button chuck manually [ → 45].
6. Pack BA ULTIMATE POWER + / BA ULTIMATE in packaging
material suitable for sterilization and storage. e.g. paper/plastic
composite packaging.
7. Conduct sterilization [ → 47].
7.3
Manual cleaning and disinfection
IMPORTANT: Manual conditioning is possible in exceptional cases if
Manual conditioning is possible in exceptional cases
the national/regional regulations are followed. The national/regional
regulations are to be checked before.
64 01 553 D3551.201.03.03.02