8. Commissioning
We recommend that the FloSKID is first commis-
sioned by nearest Salmson's customer service
agent or ask your central customer service
department.

8.1 General preparation and checking

- Before switching on for the first time, check the
wiring has been done correctly on site, particular-
ly the earthing.
- Check that the pipe connections are stress-free.
- Fill the installation and check visually for leaks.
- Open the shut-off valves on the pumps and in the
suction and discharge manifold.
- Open the pump vent screws and slowly fill the
pumps with water so that the air can escape com-
pletely.
ATTENTION! Do not allow the pump to run dry.
Dry running destroys the mechanical seal.
- Check the direction of rotation of the pumps :
switch on briefly and check whether the direc-
tion of the pumps corresponds to the arrow on
the pump label. Change over 2 phases if the
direction of rotation is not correct.
WARNING! Electrical shock hazard!
Switch off the installation main switch before
changing over the phases.
- On the control box check and set the operating
parameters required according to the attached
installation and operating instruction.
8.2 Commissioning the installation
After all preparations and checks according to
section 8.1 have been done, switch on the main
switch and set the control system to the auto-
matic mode.
ATTENTION!
Do not let the pump operate with delivery valve
closed beyond one minute.
POMPES SALMSON SAS 09/2013
9. Maintenance
- No particular maintenance is recommended for
the FloSKID during operating.
- If need be the mechanical seal can be easily
replaced.
- In long period of frost and stop it is recommend-
ed to drain the pump with the valve under mani-
folds.
ATTENTION!
Fill the pump before any new start.
English
17