Installation Overview
8
9
7
5
4
Installation Sequence
1. Prepare wall behind appliance, including additional
framing for vent outlet
2. Rough-in gas and electrical
3. Drywall and insulate behind appliance as necessary
4. Position lower section
5. Position appliance on top of lower section
6. Complete gas and electrical hookup
7. Install middle section
supported by appliance!)
8. Install HeatShift plenum/plates into upper section
2
10
above
(not
the appliance
1
2
9. Install upper section
10. Install and connect venting to appliance
11. Install and connect HeatShift fl ex pipes to appliance
and plenum/plates
12. Finish fi replace installation
13. Finish wall in front and around appliance