INSTALLATION MANUAL
2100HSC HeatShift Canopy Kit
For use with Valor 2100PK model fi replaces only
Before Installing the HSC
Prior to installation of the 2100HSC HeatShift Canopy
Kit, ensure that the following items have already been
installed or roughed in. Installing these items after HSC
installation can be diffi cult:
•
All required drywall and insulation on adjoining wall
and ceiling above kit
•
Any required wall thimble for through-wall venting
•
Rough electrical
•
Rough gas
Required for Assembly
To complete assembly, you will need:
•
2100HSC kit and 2100PKN or 2100PKP fi replace
•
(2) kiln dried wood studs, cut to planned height
•
(2) 5" Ø fl ex pipes and (4) clamps (available as LDK6
kit)
•
Venting for fi replace
•
Canopy Grille HSC-GR 14x6" (if installing Option 2, see
page 2).
•
Wood screws and self-drilling sheet metal screws (see
Installation)
The screws for assembly of the kit pieces are included.
Note: The fi replace can sit directly on the fl oor, or the
installer can build a framing base to raise the overall
installation height (which may be combustible or non
combustible). Clearance between middle enclosure
and top enclosure may also be increased to vary total
installed height. See dimensions on page 2 when
considering base height (if applicable), middle and top
enclosure clearance, and overall installation height.
WARNING
This kit REQUIRES a minimum 2-1/2" [64 mm] gap between the top of the kit and the ceiling if
Option 1 is used (see page 2) . DO NOT SEAL THIS GAP CLOSED.
4007766-02
©2019, Miles Industries Ltd.
LX1 Series
Top enclosure
Back plate
Middle enclosure
Wall
support
bracket
WARNING
To enclose the 2100HSC kit, 1/2" cement
board (or other non-combustible board) is
required. See page 10 for details.
Grille HSC-GR
(not included,
optional)
Support
frame
Support
brackets
(2, identical)
HeatShift
canopy