EC
Hydro
Midsize
GENERAL NOTE: FRONT, REAR, RIGHT HAND AND LEFT HAND REFERENCES BELOW
ARE WITH RESPECT TO AN OPERATOR AT THE CONTROLS.
1. UNCRATE - Place both power unit and cutterdeck crates on a level surface. Remove sides and top from
both the power unit and cutterdeck crates.
2. Remove three rods W on left and two rods W on
the right from the upper handle shipping bracket
and set them aside for later use.
3. Remove spring from bolt A. Repeat for other
side.
All manuals and user guides at all-guides.com
ASSEMBLY/SET-UP INSTRUCTIONS
GB-3