EC
Hydro
Midsize
GENERAL NOTE: FRONT, REAR, RIGHT HAND AND LEFT HAND REFERENCES BELOW
ARE WITH RESPECT TO AN OPERATOR AT THE CONTROLS.
1. UNCRATE - Place both power unit and cutterdeck crates on a level surface. Remove sides and top from
both the power unit and cutterdeck crates.
2. Remove three rods W on left and two rods W on
the right from the upper handle shipping bracket
and set them aside for later use.
3. Remove spring from bolt A. Repeat for other
side.
ASSEMBLY/SET-UP INSTRUCTIONS
GB-3