Installation - Assembly - Kospel EPO Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation – Assembly
EPO.G – must be installed with
the outlet and inlet pipes at the
bottom
EPO.D – must be installed with
the outlet and inlet pipes at the
top
20
1.
Bring the water system pipes and electric
supply cables (observing binding norms) to
the place where the unit will be fitted.
2.
Take off the unit's cover: undo the screws, slide
the cover off starting from the inlet and outlet
side.
3.
Fix the unit.
4.
Connect (e.g. using flexible hoses) cold water
to the inlet pipe inserting a filter in between and
connect hot water to the outlet pipe.
5.
Open the cold water valve and check for leaks.
6.
The unit is factory adjusted to connect to
single phase supply (it's equipped with
a bridge connecting terminal clamps U and V).
7.
If the unit is connected to two phases supply,
the factory mounted bridge (connecting
terminal clamps U and V) has to be taken off.
8.
Put the unit's cover back.
9.
Make sure that there is no access to live parts
through the holes at the back plate.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Epo 4Epo 5Epo 6

Table des Matières