Kessel Pumpfix F SPZ 1000 Mode D'emploi page 25

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
5.3
Floor slab installation
Bituminous membrane
Clamp the waterproofing membrane (3) on site between
the pressure sealing flange (4) and the counter-flange (2)
and screw together using the screws (1).
White tank
Insert the seal (6) into the drain body (7) and ensure that
the seal fits properly.
Grease the top of the seal.
Push the extension section into the middle flange (5) and
move it into position.
010-843
Installation and operating instructions
25 / 96

Publicité

Table des Matières
loading

Table des Matières