Valor LX1 Serie Manuel page 4

Masquer les pouces Voir aussi pour LX1 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
 WARNING
Pre-insulate and drywall adjacent wall
as necessary (or required by local code).
This will aid drywall finishing and provide
separation between the HeatShift cavity
and the adjacent wall cavity.
Installation
1. Place left hand stud (not
included, cut to planned
installation height)
vertically and fl at against
wall. Level and attach
to stud behind wall (or
provide secure backing
within wall for attach-
ment). Screw every
foot to planned height.
Suggested #10 x 3-1/2"
general purpose wood
screws, not included.
2. Fix right stud (not in-
cluded) to stud or solid
backing behind wall. Dis-
tance is 18-7/16" to the
outside of both studs.
You may use the middle
enclosure to check this
distance by temporar-
ily fi tting the enclosure
around the studs.Screw
every foot to planned
height.
3. If not done already, stop
and fi nish electrical and
gas installation while
you have room (see
"Electrical Wiring" and
"Gas Supply" in the LX1
Installer's Manual).
4
4. A bottom base or ped-
estal is not required
to install this kit. How-
ever, if one is preferred,
install it now and then
continue with remaining
steps.
5. Attached the wall sup-
port bracket to the
fi replace (4 self-drilling
screws).
Min. 2-1/2"
clearance
to fi nished
ceiling
6. Place fi replace against
the wall (with standoff s
and support bracket
between studs). Remove
carrying handles before
moving the fi replace into
fi nal position.
18-7/16"
7. Square the fi replace to
the wall and screw feet
(4) to the fl oor.
Option 1 - Top Outlet
90°

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2100hsc heatshift

Table des Matières