Valor LX1 Serie Manuel page 10

Masquer les pouces Voir aussi pour LX1 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Finishing (Both Options)
See the LX1 Installer's Manual for fi nishing materials de-
tails. To enclose the 2100HSC kit, 1/2" cement board (or
other non-combustible board) is required.
When attaching fi nishing materials to steel frame or fi re-
place body, we suggest using self-drilling screws, 1-1/2"
length. Note: you may be penetrating two layers of sheet
metal depending on where you choose to fasten.
Min 3"
above
bottom of
opening
10
 WARNING
Ensure weight of wall above is
NOT carried by the appliance.
Bottom panels
 WARNING
Do not drill or drive screws into these
marked areas (on both sides)! Electrical
and gas services are located here. See
LX1 Installer's Manual for more detail. If
in doubt, remove the bottom plates from
the opening and verify what is behind the
panels.
Finishing Materials
 WARNING
This kit REQUIRES a minimum 2-1/2" [64
mm] gap between the top of the kit and
the ceiling if Option 1 is used (see page
2) . DO NOT SEAL THIS GAP CLOSED.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2100hsc heatshift

Table des Matières