CHECKING THE SEALS IN THE INJECTION ASSEMBLY (with pressure off)
- Turn off the water supply and allow the pressure to drop to zero.
- Take off the suction tube of product (Fig. 15).
- Unscrew the retaining ring (Fig. 16).
- Pull downwards to remove the injection assembly (Fig. 17).
- Control the seals, the suction valve and the barbed fitting.
- Re-assemble in the reverse order to the above by hand.
%
5
Fig. 15
CHECKING THE DOSING SEAL
IMPORTANT ! Use no tool or metallic utensils
ADVICE: Before dismantling any part of the injection assembly it is advisable
to operate the DOSATRON, injecting clean water so as to rinse through the
injection system. In this way, risks of contact with concentrated solutions in
the injection assembly are minimized. During any such intervention, wear
protective eyewear and gloves !
METHOD OF REMOVING SEAL
Fig. 18 : Between finger and thumb, pinch the component and the seal ; push
towards one side to deform the seal.
Fig. 19 : Increase the deformation to grip the part of the seal thus exposed
and pull it out of its groove. Clean the seal seating without any tools. Refitting
is done by hand.
It is very important that the seal is not twisted once in place as this would
impair its efficiency.
Fig. 18
%
5
Fig. 16
Fig. 19
©
DOSATRON INTERNATIONAL S.A.S / 54
%
5
Fig. 17