Operation - Conti CC100 Notice Technique

Masquer les pouces Voir aussi pour CC100:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

21.

OPERATION

21.1. RECOMMANDATIONS
Open the general water tap, if it is closed, then open the water shutoff valve dedicated to
the machine.
Do not put the supplying voltage at this moment.
Verify the presence of water, by reading the pressure of the mains water inlet on the M2
manometer pump.
21.2. INITIAL FILLING
Ensure that steam taps operating levers 'V' are open (up).
Put the ON/OFF switch 'C' to position 1 (power on).
The key board turn on.
The boiler fills automatically, without heating.
The machine start to heat automatically, only when the level probe is reached by the water
A scrolling LED on keypads can inform the user about the status. (info display :« machine
en chauffe »)
Close the steam tap "V" and wait.
When the scrolling leds stops : The machine is ready to operate
(info display : « < 60°C CONTI ESPRESSO »)
21.3.
Further fillings will run automatically, according to the hot water needs.
The water level in the boiler is controlled by the electronics, by the means of a level
probe.
Edition 05/2015 - CC100 DISPLAY- TECHNICAL DOCUMENTS - page 35
SACOME, CONFIDENTIAL Document,
FURTHER FILLINGS
it is forbidden to duplicate or communicate this document without previous authorization.

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cc102 dCc103 dCc103 tri d

Table des Matières