Installation; Operation - Conti Super Essika SSK2 Notice Technique

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

16.

INSTALLATION

The installation should be carried out by a qualified technician.
A water softener has to be installed when the hardness of the water supply is superior
to 7° TH. The water softener has to be regenerated at regular intervals.
A water cut-off valve and a standardised electrical circuit protection in accordance with
the voltage and the installed power must be installed.
The water supply pipe has to be connected to the barbed nipple 3/8" at the pump head
inlet. The drain pipe has to be connected to the barbed nipple 3/8" of the drain
collector and must always allow the outflow.
THE PROTECTIONS MUST COMPLY TO THE DOMESTIC STANDARDS WHERE THE
MACHINE IS INSTALLED AND ARE AT THE CUSTOMER'S RESPONSABILITY AND
CHARGE.
When the machine is not operating, the water cut-off valve has to be closed and the
electrical power supply cut.
I
T IS IMPERATIVE THAT THE ELECTRICAL SUPPLY IS SHUT OFF DURING THE SERVICE
ON THE MACHINE
NOTE:
WHEN THE MACHINE IS NOT SUPERVISED IT MUST BE DISCONNECTED FROM
THE POWER AND WATER SUPPLY.
IT IS FUNDAMENTAL THAT THE MACHINE IS EARTHED BY THE TERMINAL PLUG.
NEVER DISCONNECT THE EARTHING WHEN THE MACHINE IS CONNECTED TO THE
POWER SUPPLY.
MEANS
FOR
SEPARATION OF AT LEAST 3 MM IN ALL POLES SHALL BE INCORPORATED IN THE
FIXED WIRING ACCORDING TO THE WIRING RULES.
17.

OPERATION:

WATER SUPPLY
Open the water supply tap and the water cut-off valve. Do not connect the electrical
connection.
A. FIRST FILLING
Switch the machine on in pressing ON/OFF
button "C" (located below the front panel).
The blue lights of the keys light up and the
automatic filling up of the boiler starts. The
machine does not heat. When water
reaches the level probe, the automatic
heating of the boiler will start.
B. NEXT FILLING
The boiler will be automatically filled as
long as hot water and steam are drawn
(level probe)
.
DISCONNECTION
FROM
THE
SUPPLY
Steam tap
Filter holder
- 18 -
HAVING
A
CONTACT
ON/OFF Switch "C"
Hot water tap

Publicité

Table des Matières
loading

Table des Matières