Cub Cadet 19A70056100 Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.
Open hood by pushing in on the rear,
right-side tab with your right hand (1),
and lifting the cover with your left hand
in the center rear of the bagger cover (2)
as shown in Figure 4-13.
Figure 4-13
8.
Install all three bag assemblies onto the
bag support brackets by inserting the
front edge in first (1), and then setting
the back edge down until it fits into the
assembly (2) as shown in Figure 4-14.
Figure 4-14
Installing the Boot Rod and
Hardware
1.
From the inside of the boot, put the two
Hex Head screws (738-1225) through the
holes at the bottom front of the boot.
See Figure 4-15.
Figure 4-15
2.
Put the mounting rod (747-06309) in
place over the Hex Head screws. Make
sure the tip of the rod is facing out from
the boot. See Figure 4-15.
3.
Begin threading the flange lock nuts
(712-04064) onto the Hex Head screws.
See Figure 4-15.
4.
Using a 7/16" wrench or socket on the
screw and a 7/16" box wrench on the
nylock nuts, tighten down so flange is
flush to secure the assembly.
Installing the Discharge Chute -
19A70056100 Triple Baggers
When installing the discharge chute, two
different installation instructions exist. For the
54" fabricated deck units, the discharge chute
elbow mounts directly onto the cutting deck.
For the 50" and 54" stamped decks, an adapter
must first be installed. Be sure to follow the
instructions that pertain to the unit you are
installing this bagger on.
54" Fabricated Deck Units:
1.
Raise the deck to its highest position.
2.
Raise the chute deflector (1 in Figure
4-16) on the deck and hold it while you
position the discharge chute over the
chute opening.
1
3
Figure 4-16
3.
Insert the end of the discharge chute
elbow (2) into the hole provided in the
deck wheel mount as shown in the inset
of Figure 4-16.
4.
Pivot the discharge chute rearward until
the hole in the discharge chute elbow
aligns with the pin on the deck. Move the
discharge elbow down onto that pin as
shown in 3 of Figure 4-16.
5.
Secure the discharge chute elbow to
the cutting deck using a wing knob
(720-04122) included with the bagger kit.
Refer to Figure 4-17.
On 50" and 54" Stamped Decks:
1.
Raise the deck to its highest position.
2.
Remove the deck pin rubber protective
cap, 1 in Figure 4-18.
3.
Raise the chute deflector (2 in Figure 4-18)
on the deck and hold it while you install
the chute adapter (731-10133) (3), onto
the deck as shown in Figure 4-18.
3
1
2
S
4 — A
ection
Figure 4-17
2
Figure 4-18
& i
SSembly
nStAllAtion
9

Publicité

Chapitres

Table des Matières
loading

Table des Matières