Product Information
– Always keep these instructions together with the product even when given to other persons.
– Check expiration date: See imprint on foil pack manifold (month/year). Do not use expired product.
– Foil pack temperature during usage:
– Base material temperature at time of installation:
Exception in hollow, solid and multi-wythe solid clay brick: between 41°F and 104°F / +5°C and 40°C.
– Conditions for transport and storage: Keep in a cool, dry and dark place between 41 °F and 77 °F /
5°C and 25°C.
– For any application not covered by this document / beyond values specified, please contact Hilti.
– Partly used foil packs must remain in the cassette and has to be used within 4 weeks. Leave the mixer
attached on the foil pack manifold and store within the cassette under the recommended storage condi-
tions. If reused, attach a new mixer and discard the initial quantity of anchor adhesive.
WARNING
Improper handling may cause mortar splashes.
– Always wear eye protection, gloves and protective clothes during installation.
– Never start dispensing without a mixer properly screwed on.
– Attach a new mixer prior to dispensing a new foil pack (ensure snug fit).
– Use only the type of mixer (HIT-RE-M) supplied with the adhesive. Do not modify the mixer in any
way.
– Never use damaged foil packs and/or damaged or unclean foil pack holders (cassettes).
Poor load values / potential failure of fastening points due to inadequate borehole cleaning.
– Hilti hollow drill bits TE-CD, TE-YD must be used in conjunction with a properly maintained Hilti
vacuum cleaner with model and suction capacity (volumetric flow rate) as specified in the accessory
table.
– The boreholes must be free of debris, dust, water, ice, oil, grease and other contaminants prior to
adhesive injection.
– For blowing out the borehole – blow out with oil free air until return air stream is free of noticeable
dust.
– For brushing the borehole – only use specified wire brush. The brush must resist insertion into the
borehole – if not the brush is too small and must be replaced.
Borehole filling in solid masonry: Ensure that boreholes are filled from the back of the borehole without
forming air voids. If necessary use the accessories / extensions to reach the back of the borehole.
Borehole filling in hollow masonry: Use a mesh sleeve. Fill the mesh sleeve with mortar from the
centering cap until mortar escapes at the centering cap (filling control).
Multi-Wythe Solid Brick application: HIT-SC sieve sleeves / sieve sleeve combinations have to be filled
outside the bore hole: Push the mixer to the bottom of the last mesh sleeve (use mixer extension if
necessary).Inject the anchor adhesive starting at the bottom of the last mesh sleeve while slowly with-
drawing the mixing nozzle towards the centering cap, step by step, after each pull of the trigger. HIT-SC
sieve sleeves have to be filled completely without forming air voids until anchor adhesive escapes at the
centering cap (filling control).
Not adhering to these setting instructions can result in failure of fastening points!
Printed: 14.05.2018 | Doc-Nr: PUB / 5380359 / 000 / 01
between 41 °F and 104 °F / +5 °C and 40 °C.
between 23 °F and 104 °F / –5 °C and 40 °C.
Hilti HIT-HY 270
en
43