Operation; Running-In Period - ProMinent DULCOTEST OZE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation / Operation
Figure 3
Electrical
connection
to sensor
7
IMPORTANT
• The sensor may not be used in surfactant-containing water or
• Do not switch off the measuring system during interval operation!
7.1
The sensor requires a certain running-in period to be able to provide a stable
reading.
Initial commissioning:
Recommissioning:
Replacement of diaphragm/electrolyte:
32
Position approx. 5 cm of the measuring line in the sensor and tighten the
clamping screw of the M12 screw fitting.
Fully insert the sensor into the housing and gently turn clockwise up to the
stop. Ensure that the lugs of the bayonet mount do not break.

Operation

solutions!
After any operation without ozone, running-in periods are to be
reckoned with.
If required, switch on metering unit time-delayed!
If no ozone is metered for a longer period of time, the sensor must be
disconnected from the power supply and stored dry.

Running-in period

2 - 6 h
1 - 3 h
approx. 0.5 h
®
ProMinent

Publicité

Table des Matières
loading

Table des Matières