Assembling The Handles; Installing The Thermometer; Placing The Grease Bucket - Pit Boss PB340TGW1 Instructions D'assemblage Et D'utilisation

Masquer les pouces Voir aussi pour PB340TGW1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. ASSEMBLING THE HANDLES

Parts Required:
1
x
Lid Handle (#10)
1
x
Barrel Handle (#10)
Handle Bezel (#9)
4
x
Installation:
Remove the pre-installed screws from the lid handle. From inside the barrel
lid, insert one screw to protrude to the outside. Add a bezel on the screw,
then hand-tighten the screw (from the inside) into the lid handle. Repeat for
the other side. Note illustration 5A.
On the non-hopper side of the main barrel, repeat same installation for the
barrel handle. Note illustration 5B.
NOTE: Use the barrel handle to move the grill when the unit is expanded
into its full, upright position.

6. INSTALLING THE THERMOMETER

Parts Required:
Thermometer Kit (#2)
1
x
Installation:
Remove the pre-installed nut from the thermometer. Insert the thermometer
into the hole provided on the top of the lid on the main barrel, then secure
by re-installing the nut from the inside. Rotate the thermometer so the text
is level and upright.
NOTE: If rotation is askew, this will result in incorrect readings.

7. PLACING THE GREASE BUCKET

Parts Required:
1
x
Grease Bucket (#11)
Installation:
Place the grease bucket on the spout hook on the end of the main barrel.
Ensure it is level to avoid grease spills.
5A
5B
6
7
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10665

Table des Matières