Télécharger Imprimer la page

Broan NuTrone 60000 Serie Guide D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

TYPICAL INSTALLATION
The 60000 Series hood can be installed without a soffit and ducted
vertically following these steps:
Purchase an RN Se-
ries Soffit Chimney
(of same width and
color as your hood)
from your distributor.
1. Frame-in ceiling
2. Mount rough-in
plate (including
FINISHED
ductwork and
CEILING
MATERIAL
wiring)
3. Finish drywall
4. Install optional
backsplash
5. Install blower
6. Mount soffit
APPROX. 30"
chimney to
ABOVE
COOKING
ceiling and hood
SURFACE
to soffit chimney
CONSTRUCT CEILING FRAMING
NOTE: A MINIMUM CEILING OPENING OF 10" IS REQUIRED
TO ACCOMMODATE THE DUCTWORK. SEE ILLUSTRATION
BELOW.
1. Use 2x4's to construct the support framing. The considerable
weight of the blower and hood make this necessary.
2. Mark the center line of the installation. Nail two 2x4's (wide side
down) so that their inner edges are 9-3/4" from the center line.
3. 36" AND WIDER HOODS: Nail a second set of 2x4's (wide side
down) so that their outer edges are the hood-width apart.
4. Make two wood spacers: 2" x 10-1/2" x drywall thickness. Attach
them to framing as shown - flush with inner edges of framing and
with front edges 11-1/2" from finished back wall.
VERTICAL DUCTING
DUCT &
ROOF CAP
TRANSITION
ADDITIONAL
ROUGH-IN
PLATE
SOFFIT
CHIMNEY
HOOD
FINISHED
WALL MATERIAL
SPACERS
INSTALL ROUGH-IN PLATE & DUCT
(INCLUDED IN 325H OR 326H BLOWER/ROUGH-IN KITS)
FOR MODELS 331H, 332H, 335 & 336 REMOTE BLOWERS: MODEL
a
332KR ROUGH-IN PLATE IS REQUIRED - PURCHASE SEPA-
RATELY.
CEILING
FRAMING
1. Use 10" round ductwork (for 326H, 331H, 332H, 335 or 336 Blower),
or 7" round ductwork (for 325H Blower). Run ductwork from roof
cap, wall cap, or remote blower to the installation location. For best
performance, use the straightest possible duct run and the fewest
number of elbows. Tape all joints.
2. Run 120 VAC electrical power cable from service panel to installa-
tion location.
MODEL 326H BLOWER ROUGH-IN INSTALLATION SHOWN
MODEL 325H - USE 7" ROUND DUCT WITHOUT TRANSITION
4. Remove wire box cover. Remove a knockout from the wiring box.
Feed 6" of power cable through opening and attach cable to wiring
box with appropriate connector.
5. Wire black to black, white to white, and green or bare wire beneath
green ground screw. Replace wire box cover.
6. Align rough-in plate with front corners of spacers. Secure with six
(6) screws packed with plate.
7. Connect ductwork to rough-in plate and tape joint.
8. Install and finish drywall.
Go to "COMPLETE INSTALLATION" section on Page 9.
4
(NO SOFFIT)
SPACER

Publicité

loading