Construction Of The Multipart Insulation - meibes Victaulic 66457.0 Documentation Technique Pour Le Montage Et La Mise En Service

Systèmes pour des grandes installations
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Pumpengruppen DN25 / DN32

6.9 Construction of the multipart insulation

1. Pump group with rear insulation jackets and retaining clips
2. Installation/removal of the middle insulation pieces
Note:
The respective slip on and slip off direction has to be
observed. If and when required, install the upper
insulation pieces when tilted.
3. Installation/removal of the pump cover as well as of
the front insulation jackets
Note:
All commercially available pumps (with an installation
length of 180 mm) can be fi tted without reworking the
insulation. For this purpose, the front insulation jackets,
the pump cover and the respective middle insulation
pieces have to be removed (as shown in the illustration).
When a mixer servomotor (MK group) has been used, the
corresponding cover of the insulation has to be removed.
43
Effiziente Energietechnik

Publicité

Table des Matières
loading

Table des Matières