Télécharger Imprimer la page

STOTT PILATES SPX Reformer Manuel Du Propriétaire page 14

Publicité

Les langues disponibles

Les langues disponibles

Step 3. Installing New Springs
Determine replacement spring package.
Springs are color-coded at the ball end. Red = 100%, Blue = 50%, White = 25%
nOTE:
SPX
Reformers arrive with four 100% springs, and one 50% spring.
®
SPx SPRING PACKAGE
4
100% arrange as follows:
x
1
#
100
100
Leaving middle position free, place 100% springs
in remaining positions on the carriage, as illustrated
on right. Install 50% spring in the center.
Replacement spring packages are also available.
TRADITIOnAL SPRING PACKAGE
4
100%, 1
50% arrange as follows:
x
x
1
2
#
#
100
100
Place 50% spring in the center and two
100% springs on either side.
1 Starting with spring #1 from your spring package,
remove nylon locknut from bolt end of spring.
14
2
3
#
#
100
100
4
3
#
#
50
100
100
4
#
nOTE: Spring sleeves are required for proper function
of this Reformer if it features a plastic spring holder.
HIGH-PRECISION SPRING PACKAGE
HIGH-PRECISION SPRING PACKAGE
3
3
100%, 1
100%, 1
x
x
5
1
1
#
#
#
100
100
if this set purchased start here:
Place 50% spring in the center, and 25% spring to
one side. Place 100% springs in remaining positions.
2 Start at one end of the carriage. Thread bolt end of
spring #1 through first hole of plastic spring holder.
50%, 1
50%, 1
25%
25% arrange as follows:
arrange as follows:
x
x
x
x
2
2
3
3
#
#
#
#
50
25
50
25
100
100
4
4
5
5
#
#
#
#
100
100

Publicité

loading