Télécharger Imprimer la page

Pentair INTELLIPOOL Manuel page 9

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 122
Water temperature probe installation
1 - The water temperature probe can be installed outside the by pass
before the pump filtration or filter inlet for a better reading.
2 - Drill a 10 mm diameter (3/8 inch) in the PVC (50 or 63mm) piping
3 - Place the metal hose clamp over the sensor and tighten.
3
Attach the Control center / Probe unit on the wall
Drill three holes equipped with plugs as shown below.
1 - Screw the top screws and hang the unit.
2 - Screw the 2 screws from the bottom.
3 - Install the 2 rubber insulation covers.
1
Probe unit and Control center location
The Probe unit needs to be positioned in close proximity to the by pass carrying the probes.
The Control center need to be positionned to be able to easely reach the keypad in order to adjust settings.
The lifetime of the probes (depending on usage conditions) is about 2 years for the pH probe, 5 years
for the ORP probe and lifetime for conductivity sensors and temperature. Only Pentair probes are
compatible and guarantee the proper functioning of IntelliPool
IT IS IMPERATIVE TO ISOLATE THE BYPASS BY CLOSING BOTH VALVES BEFORE WANTING
TO CHANGE A PROBE UNDER THREAT OF FLOODING.
2
2
Ø 10 mm
.
®
Authorised cables
Ø 8 / 8.8 mm
Ø 7.0 / 7.5 mm
Ø 8 / 8.8 mm
3
= RO2V (2 x 1.5 mm
or 2 x 2.5 mm
2
= VGV (4 x 0.75 mm
2
)
= RO2V (3 x 1.5 mm
2
or 3 x 2.5 mm
)
2
2
)
7

Publicité

loading