Blower Installation - Napoleon TIMBERWOLF EPI22 Instructions D'installation Et D'opération

Encastré au bois
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.6

BLOWER INSTALLATION

TURN OFF THE ELECTRICAL POWER BEFORE SERVICING THIS APPLIANCE.
USE ONLY WOLF STEEL APPROVED OPTIONAL ACCESSORIES AND REPLACEMENT PARTS WITH
THIS APPLIANCE. USING NON-LISTED ACCESSORIES (BLOWERS, DOORS, LOUVRES, TRIMS,
ETC.) COULD RESULT IN A SAFETY HAZARD AND WILL VOID THE WARRANTY AND CERTIFICA-
ENSURE THAT THE BLOWER'S POWER CORD IS NOT IN CONTACT WITH ANY SURFACE OF THE
APPLIANCE TO PREVENT ELECTRICAL SHOCK OR FIRE DAMAGE. DO NOT RUN THE POWER
Drywall dust will penetrate into the blower bearings, causing irreparable damage. Care must be taken to
prevent drywall dust from coming into contact with the blower or its compartment. Any damage resulting from
this condition is not covered by the warranty policy. Use of the blower increases the output of heat.
This blower is thermally activated. Depending on the intensity of the fi re, the blower will start 15-30 minutes
after lighting. The thermal switch for the appliance is affi xed to an adjustable bracket, which should be
positioned so it is in contact with the blower housing as illustrated.
For shipping purposes the blower housing has
been stored within the fi rebox. We recommend
removing the door prior to installing the blower.
A.
Remove the two screws securing the
cover and set aside.
B.
Engage the clips onto the retainer
bracket and secure using the screw
supplied.
C.
Reattach the cover with the two screws
previously removed.
WARNING
!
RISK OF FIRE AND ELECTRICAL SHOCK.
TION.
CORD BENEATH THE APPLIANCE.
COVER
BLOWER
HOUSING
CLIPS
RETAINER
BRACKET
ADJUSTABLE
17
EN
W415-1466 / 04.21.15

Publicité

Chapitres

Table des Matières
loading

Table des Matières