6604206.book Seite 26 Mittwoch, 30. November 2016 5:54 17
4 Preparation
26
4
Preparation
4.1
Initial start-up and longer breaks in use
➢ Sterilize the instrument and accessories prior to startup.
Instrument
➢ Clean and maintain the instrument after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
4.3
Before each patient
1. Purge the water and air channels for 30 seconds.
Preparation _ Instrument
2.
CAUTION! Keep the motor running.
Insert the instrument [ → 30].
3. Insert the bur instrument [ → 31].
4. Set a sufficient amount of cooling water (> 50 ml/min).
Operating Instructions Midwest E Pro / E Plus
66 04 206 D3686.201.01.02.02