Installation - Riello PRESS 200 T/N ECO Instructions Pour Installation, Utilisation Et Entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.

INSTALLATION

3.1
FUEL OIL SUPPLY SYSTEMS
RING SUPPLY LINE
For heavy oil with viscosity up to 50°E/50°C.
1 - Tank (heated for heavy oil)
2 - Filter (with resistor for oil > 7°E/50°C)
3 - Transfer pump
4 - Control manometer
5 - Air dampers for burner exclusion (coupled)
IMPORTANT NOTES
- For the oil to flow easily all the pipes must be properly sized, insulated and heated (by electricity, steam or hot
water).
- The transfer pump capacity should be all the least double of that of the burner pump.
If several burners are supplied through the same ring supply line, the transfer pump should have a capacity of
approx. 30% more than the sum of the single burner capacities.
- For starting-up: after excluding the burner by the air dampers (5) circulate the oil flow in the supply ring; Once
full rate circulation has been reached open the air dampers and supply the burner normally.
GRAVITY SYSTEM
Only for heavy oil with viscosity up to 7°E/50°C.
Attention:
before starting the burner, ensure that the return line is not clogged.
Any obstruction may damage the sealing of the pump.
5840
Pump priming:
loosen the cap of the vacuometer fitting
(6, fig. 1) and wait for the oil flow out.
H: Difference in height
L: Length of the suction tube
D2735
D2734
6 - Burner
7 - Pressure adjuster
8 - Filter (with resistor for oil > 7°E/50°C)
9 - Burner pump
5
GB
L metres
H
Diam.
Diam.
metres
1"
1 1/4"
0
2
10
0.5
3
11
1
4
12
1.5
5
13
2
6
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

631 m34378213437822

Table des Matières