the specific type of wall.
d) After completing the hydraulic connections, to help bleed
air from the coil, you are advised to connect the water out-
let pipe to the fitting at the top; any inversion will not
jeopardise the proper functioning of the unit.
The position and diameter of the water connections are shown
in the dimensions.
You are advised to adequately insulate water lines, or fit the
auxiliary condensate drain tray (available as an accessory), to
prevent dripping during the cooling function.
N.B.: Before connecting the condensate discharge, use a tool
to break the tray membrane (if fitted) on the water connec-
tions side, seal the discharge that is not used with the cap
supplied as standard.
The condensate drain network must be properly scaled and
the piping situated in such a way as to keep an adequate slope
along the route (min. 1%). If condensate is discharged into the
sewage system, install a siphon to prevent the return of
unpleasant odours into the room.
Test the seal of the water connections and the condensate
discharge.
e) Fit any accessories.
f) To modify the electronic thermostat settings, use the Dip-
Switches through the specific window on the rear of the con-
trol panel (see section "DIP SWITCH CONFIGURATION").
g) Complete the electrical connections with reference to the indi-
cations in the wiring diagrams and the "ELECTRICAL
CONNECTIONS" section, connecting the control panel connec-
tor to the connector on the inside of the fan coil and also com-
pleting the earth connection.
h) Refit the casing.

ELECTRICAL WIRINGS

WARNING: check that the power supply is disconnected
before carrying out any procedures on the unit.
In particular, the electrical wirings require checks relating to:
- Measurement of the electrical system insulation resistance;
- Continuity of the protection wires.
The electrical circuits are connected to the 230V mains voltage;
all the connections and components must therefore be corre-
spondingly insulated for this voltage.
CHARACTERISTICS OF THE CONNECTION CABLES
Use H05V-K or N07V-K type cables with 300/500V with insulation,
piped or ducted.
Use power supply cables with a minimum cross-section of 1
2
mm
.
All the cables must be piped or ducted until they are inside the
fan coil.
The cables leaving the pipe or raceway must be positioned in
such a way that there are not traction or twisting stresses and
6,5
10
10
14
they are anyway protected from outside agents.
For all the connections, follow the wiring diagrams supplied with
the device and shown in this documentation.
To protect the unit against short circuits, fit an omnipolar
thermal-magnetic trip 2A 250V (IG) to the power line with a
minimum contact opening distance of 3mm.
We recommend using differential devices suitable for inter-
vening for currents of different type:
sinusoidal AC and pulsating DC currents suddenly
applied or slowly rising.
sinusoidal AC with frequency up to 1000 hz
Each control panel can control a single fan coil.

ROTATING THE COIL

If hydraulic connections require the rotation of the coil, and pro-
ceed as follows:
– remove the electrical connections from the terminal strip;
– remove the probe from the coil;
– remove the screws fixing the basin and remove it;
– remove the screws securing the coil, then remove the coil;
– remove the push-outs on the right-hand side;
– rotate the coil and secure it with the previously removed
screws;
– refit the tray, securing it with the screws, insert the plastic
plugs supplied in the holes left free by the hydraulic connec-
tions;
all the trays can be used for condensate drainage on both
sides.
N.B.: Before connecting the condensate drain remove the
cap in this plastic on the container and use it to plug the
drain is not needed..
Seal the unused drainage hole with the cap supplied as
standard.
– slide out the electrical connections from the right-hand side,
remove the push-out and move the cable guide from the right
to the left side;
– move the motor cable on the left side so that it passes
through the fairing;
– move the terminal block and the GND U-bolt to the left side;
– restore the motor cable electrical connections;
– fit the battery probe;
– remove the selector cards from the RH element;
– disconnect the microswitch;
– pass the microswitch cable through the window on the oppo-
site side;
– fit the thermostat card (selector) on the LH element and fit the
knobs;
– restore the electrical connections on the control panel.
– assembly of this furniture at the machine cover.
6,5
10
10

Publicité