Télécharger Imprimer la page

Monogram ZV850 Instructions D'installation page 12

Masquer les pouces Voir aussi pour ZV850:

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—VENTED TO THE OUTSIDE
1
MOUNT TEMPLATE
tape in place.
front of the hood.
provide parallel alignment with the countertop
below.
through the ceiling.
2
INSTALL UPPER SUPPORT
FRAME
joists and/or cross framing with the 4 screws
screws must be driven into the center of the joists
and/or cross-framing.
vertically and horizontally.
12
Installation Instructions
Front of Hood
Wire Access Hole
3
INSTALL LOWER SUPPORT
FRAME
frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
24" Minimum
"
the desired height above the countertop. Tighten
screws.
IMPORTANT:
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
"
31-10725 Rev. 6

Publicité

loading

Ce manuel est également adapté pour:

Zv855