Figure B1: General construction rules for post-installed rebars
Post-installed rebar may be designed for tension forces only.
The transfer of shear forces between new concrete and existing structure shall be designed additionally
according to EN 1992-1-1.
The joints for concreting must be roughened to at least such an extent that aggregate protrudes.
If the clear distance between lapped bars exceeds 4 · ϕ, then the lap length shall be increased by the
*)
difference between the clear bar distance and 4 ·ϕ
c
concrete cover of post-installed rebar
c
concrete cover at end-face of existing rebar
1
c
minimum concrete cover according to Table B2 and to EN 1992-1-1
min
ϕ
diameter of reinforcement bar
l
lap length, according to EN 1992-1-1
0
effective embedment depth ≥ l
l
v
d
nominal drill bit diameter, see Annex B8
0
Injection system Hilti HIT-HY 150 MAX
Intended Use
General construction rules for post-installed rebars
.
+ c
0
1
Page 10 sur 25 | 2 5 / 0 6 / 2 0 1 8
8 mm ≤ ϕ ≤ 25 mm
Annex B2