Télécharger Imprimer la page

Hilti HY-150 MAX Mode D'emploi page 13

Publicité

Les langues disponibles

Les langues disponibles

European technical assessment ETA-0 8 / 0 2 0 2
English translation prepared by CSTB
Figure B2:
General construction rules for Hilti tension anchor HZA-R
Hilti tension anchor HZA-R may be designed for tension forces only.
The tension forces must be transferred via an overlap joint to the reinforcement in the existing structure.
The length of the bonded-in smooth shaft may not be accounted as anchorage.
The transfer of shear forces shall be ensured by appropriate additional measures, e.g. by shear lugs or
by anchors with a European technical assessment (ETA).
In the anchor plate the holes for the Hilti tension anchor shall be executed as elongated holes with the
axis in the direction of the shear force.
If the clear distance between lapped bars exceeds 4 · ϕ, then the lap length shall be increased by the
*)
difference between the clear bar distance and 4 ·ϕ
c
concrete cover of Hilti tension anchor HZA-R
c
concrete cover at end-face of existing rebar
1
c
minimum concrete cover according to Table B2 and to EN 1992-1-1
min
ϕ
diameter of reinforcement bar
l
lap length, according to EN 1992-1-1
0
l
effective embedment depth,
v
l
length of the smooth shaft or the bonded-in threaded part
e
l
overall embedment depth
e,ges
d
nominal drill bit diameter
0
Injection system Hilti HIT-HY 150 MAX
Product description
General construction rules for HZA-R
Page 12 sur 25 | 2 5 / 0 6 / 2 0 1 8
.
Annex B4

Publicité

loading