4. Installation
Follow the safety instructions in chapter 2.
A general plan of the connection possibilities for the PCB can be found at the
end of the document.
4.1
Installing the control unit
The control unit can only be opened when the main switch [1-1] is in
the OFF position.
• Loosen the screws for the housing cover [1-5] and open the housing cover.
• Install the housing at the planned spot, using all four attachment possibilities
in the corners.
• Pay attention to the ambient conditions. There is a drilling template included
in the scope of delivery.
4.2
Connect the mains cable [2]
Isolate the system! Make sure that the electrical
components are disconnected from the power supply
during work.
Connect the mains cable by:
• Laying the connection cable through the housing openings up to the terminal
clamps and main switch.
• Establish the connections in accordance with the connection diagram (in the
housing cover of the control unit).
46
Connection overview for the mains cable
Source
Mains
Installation and operating manual
PE
N
T1
T2
T3
5
[2]
Connection
Type of lead
Label
cable
Protective
yellow/green
earth
neutral
blue
5-core
Phase
L1
Phase
L2
Phase
L3
Connection
name
PE
N
T1
T2
T3
010-532_03