Left & Right Glass Sidelights (Box #2):
• Place the Front Left Sidelight panel into the Floor panel slot and the adjacent Left Wall panel
slot.
• Place the Front Right Sidelight panel into the Floor panel slot and the adjacent Right Wall
panel slot.
Ceiling (Box #1):
• Install Styrofoam packing squares on top of the Right & Left Wall panels. One block should be
placed in the front portion and one toward the rear portion of each wall. These will be used to
set the ceiling on.
• The ceiling can now be set in place on top of the Styrofoam blocks.
3-4 Person Infrared Sauna Prime+ 1515C
Page 10
150612
Rev. 3