3. Installation
3.5
Battery assembly on the empty battery cabinet 3 110 94
WARNING
Do not move the EBC after the installation of the batteries
INDICATION
It is mandatory to properly fill out the product label after the installation of the batteries
STEP 1: Remove the right/left side panel.
STEP 2: To install battery in the battery bank
STEP 3: Install the battery guardrail.
STEP 4: Using nylon rivet to fix mylar film.
STEP 5: Connect Anderson terminal.
STEP 6: Install the fuse into the fuse holder.
STEP 7: Measure the voltage of terminal block to ensure the battery connections are correctly.
STEP 8: Install the right/left side panel.
36
STEP 1
STEP 1
STEP 2
STEP 3