Installation Checklist - BIG ASS FANS Isis Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Checklist

Did a structural engineer approve the mounting structure? See page 7 for Big Ass Fans-approved
mounting structures.
Will the fan be installed so that the airfoils are at least 10 ft (3.05 m) above the floor?
Will the fan be installed so that the airfoils have at least 2 ft (0.61 m) of clearance from
obstructions?
Will the fan be installed so that it is not subjected to high winds such as from a Heating,
Ventilating, and Air Conditioning (HVAC) system or near a large garage door?
Will the fan be mounted where it will not come into direct contact with water? The fan should not
be mounted where it will come into direct contact with water unless it is labeled, "Suitable for use in wet
locations."
Will the distance between multiple fans be at least 2.5x the fans' diameter when measured from
the centers of the fans?
If you ordered multiple fans, did you keep the parts of each fan together?
What type of circuit does your building structure have, 3-wire or 2-wire? Isis
controller that is compatible with 3-wire circuits. If your building structure includes a 2-wire circuit, the
Limited Access Controller and Remote must be installed with the fan. If you require the Limited Access
Controller and did not note it at the time of order, contact Customer Service.
WWW.BIGASSFANS.COM
Isis
®
©2014 DELTA T LLC
ALL RIGHTS RESERVED
is shipped with a
®

Publicité

Chapitres

Table des Matières
loading

Table des Matières