SMA SUNNY BOY 3.0-US Instructions D'installation page 62

Masquer les pouces Voir aussi pour SUNNY BOY 3.0-US:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8 Disconnecting the Inverter from Voltage Sources
3. Secure the DC load-break switch against
reconnection using a suitable padlock.
4. If the multifunction relay is used, switch off any supply voltage to the load.
5. Wait until the LEDs have gone out.
6. Unscrew all six screws of the enclosure lid of the Connection Unit and remove the enclosure lid
carefully towards the front (TX25). When doing so, note that the LED assembly in the
enclosure lid and the communication assembly in the inverter are connected via a ribbon
cable.
7. Pull the ribbon cable connecting the LED assembly in
the enclosure lid to the communication assembly out
of the jack located on the communication assembly.
8. Use a current clamp to ensure that no current is present in the DC conductors.
9. Ensure there is no voltage on the AC-out terminal block between L1 and N and L2 and N
using a suitable measuring device. To do this, stick the test probe in each rectangular opening
of the terminal.
10. Ensure there is no voltage on the AC-out terminal block between L1 and the equipment
grounding conductor and L2 and the equipment grounding conductor using a suitable
measuring device. To do this, stick the test probe in each rectangular opening of the terminal.
62
SBxx-1SP-US-41-IA-xx-12
SMA Solar Technology AG
Installation Manual

Publicité

Table des Matières
loading

Table des Matières