Connecting The Inverter To The Utility Grid - SMA SUNNY BOY 3.0-US Instructions D'installation

Masquer les pouces Voir aussi pour SUNNY BOY 3.0-US:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Electrical Connection
Compatible grid configurations:
The connection procedure will vary, depending on the grid configuration; the country data set may
have to be set. The following table provides an overview of the compatible grid configurations,
which conductors have to be connected to the inverter to comply with the grid configuration and
which country data set can be set. As standard, the inverter is meant for connection to a utility grid
with a 208 V wye connection or a 240 V split-phase system, and the country data set
UL1741/2016/120 L-N-L is factory-set.
Compatible grid configura-
tion
240 V split-phase system
208 V wye connection
208 V delta connection
240 V delta connection
6.2.2

Connecting the Inverter to the Utility Grid

Requirements:
☐ All electrical installations must be carried out in accordance with the local standards and the
National Electrical Code
☐ The connection requirements of the grid operator must be met.
☐ The grid voltage must be within the permissible range. The exact operating range of the
inverter is specified in the operating parameters.
Procedure:
1. Disconnect the AC circuit breaker and secure it against reconnection.
2. Remove the adhesive tape from the enclosure opening for the AC connection.
3. Insert the conduit fitting into the opening and tighten from the inside using the counter nut.
4. Attach the conduit to the conduit fitting.
32
SBxx-1SP-US-41-IA-xx-12
Conductors to be
connected
L1, L2 and N
L1, L2 and N
L1 and L2
L1 and L2
®
ANSI/NFPA 70 or the Canadian Electrical Code
SMA Solar Technology AG
Configurable country data sets
• UL1741/2016/120 L-N-L
• HECO_OHM Rule 14H SDR
1.1/120 L-N-L
• CA Rule 21 / 120 L-N-L
• NE-ISO / 120 L-N-L
• UL1741/2016/208 L-L
• HECO_OHM Rule 14H SDR
1.1/208 L-L
• CA Rule 21 / 208 L-L
• NE-ISO / 208 L-L
• UL1741/2016/240 L-L
• HECO_OHM Rule 14H SDR
1.1/208 L-L
• CA Rule 21 / 240 L-L
• NE-ISO / 240 L-L
®
CSA C22.1.
Installation Manual

Publicité

Table des Matières
loading

Table des Matières