Tecno-gaz Europa B EVO Mode D'emploi page 61

Masquer les pouces Voir aussi pour Europa B EVO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Connection for water filling pipe and plastic funnel
Use with plastic funnel and water filling pipe with filter
Picture
Envelope standard
Water filling pipe with filter
Use to charge water with pump (par.8.2)
Picture
Envelope standard
Water discharghe pipe
Use to empty used water tank (par.8.9)
Picture
Envelope standard
Rilsan pipe
Connect one pipe end into the used water overflow - condensate drain pipe fitting (FIG.1 –
pos.4), and put the other end in a tank
Picture
Envelope standard
ENGLISH
FIG.14
1
FIG.15
1
FIG.16
1
FIG.17
1
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Europa b evo 24

Table des Matières