Maintenance; Replacement Of The Diaphragm - Ecolab MFV II Manuel D'utilisation

Soupape multifunction
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Maintenance

6.1

Replacement of the Diaphragm

1.
Switch the metering pump off and empty the pressure line
Ä Chapter 4.2.4 'Draining function' on page 21).
(
2.
Loosen the casing screws (Pos. 13) and remove the valve lid (Pos. 14).
3.
Remove the sealing plug (Pos. 10) on the operation button either manually or with a
small screwdriver.
4.
Loosen the screw (Pos. 11) and replace the diaphragm (Pos. 15).
5.
Tighten the casing screws diagonally equally (3-4 Nm).
Fig. 5: Replacing the diaphragm
10 sealing plug
11
screws
13 casing screws
CAUTION!
The diaphragm must be held when the screw (Pos. 11) is being loosened
due to the spring tension.
NOTICE!
The tightening torque of the valve screws must be re-tightened after 24
hours. The tightening torque is 3-4 Nm.
417101224 Rev. 05-05.2019
14 valve lid
15 diaphragm
26

Publicité

Table des Matières
loading

Table des Matières