Pressure Check; Restricting Vertical Vents - Napoleon GD19-1N Instructions D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11.2 PRESSURE CHECK

Check Pressure Readings:
Inlet pressure can be checked by turning screw (A) counter-clockwise 2 or 3
turns and then placing pressure gauge tubing over the test point. Gauge should
readas described on the chart below. Check with main burner operating on
"HI".
Outlet pressure can be checked the same as above using screw (B). Gauge
should readas described on the chart below. Check with main burner operating
on "HI".
AFTER TAKING PRESSURE READINGS, BE SURE TO TURN SCREWS CLOCKWISE FIRMLY TO RESEAL.
DO NOT OVERTORQUE.
Leak test with a soap and water solution.
Prior to pilot adjustment, ensure that the pilot
assembly has not been painted. If overspray or
painting of the pilot assembly has occurred
remove the paint from the pilot assembly, or replace. Fine emery cloth or sandpaper can be used to remove
the paint from the pilot hood, electrode and fl ame sensor.

11.3 RESTRICTING VERTICAL VENTS

Vertical installations may display a very active fl ame. If this appearance is not desirable, the vent exit must
be restricted using a restrictor vent kit. Refer to "ACCESORIES" in the "REPLACEMENTS" section for the
appropriate kit. This will reduce the velocity of the exhaust gases, slowing down the fl ame pattern and creating
a more traditional gentle fl ame appearance. Specifi c instructions are included with the kit.
Natural Gas
Natural Gas
Pressure
(inches)
(millibars)
7"
17.4mb
Inlet
(MIN. 4.5")
(MIN. 11.2mb)
3.5"
8.7mb
Outlet
47
B
A
Propane
Propane
(inches)
(millibars)
32.4mb
13"
(MIN. 27.4mb)
(MIN. 11")
10"
24.9mb
39.5B
77.3
W415-1351 / 08.29.14
EN

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gd19-1p

Table des Matières