Measurement
station
In a complete measuring station the DULCOTEST
connected to the DULCOMETER
wire signal lead. The controller is connected to the power supply.
The sensor is mounted either in the DLGIII or in the modular DGM in line
probe housing. A sampling tap (see Ordering information, Chapter 15) for the
external DPD-measurement (see Calibration, Chapter 8.2) can be screwed into
the base plate of the DGM.
The in-line probe housing is hydraulically connected to the sample water flow.
Fig. 2
Measurement
station
®
ProMinent
Chlorite
R?
DULCOMETER
STOP
Sample water
inlet
Design and function
®
CLT 1 sensor is electrically
®
D1C, Chlorite control is via a standard two-
DULCOMETER
D1C, Chlorite
80
60
40
25
l/h
®
Two-wire signal
lead
®
DULCOTEST
CLT 1
Sample water
outlet
DGMa in line
probe housing
Sampling tap
31