Cabinet Cutouts - Zephyr DLI-E30ASX Mode D'emploi

Hotte de ventilation à aspiration descendante
Masquer les pouces Voir aussi pour DLI-E30ASX:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Cabinet Cutouts

CAUTION
BEFORE CUTTING HOLE IN CABINET FOR DUCTWORK,
check for interference with floor joists, wall studs,
electrical wiring, or plumbing.
Use the dimensions in illustrations to help plan how and where to
provide duct access through your cabinet. Generally, 1-7/8" x 19"
rectangular duct will be used through left, right, below and back of
cabinet - while 8" round duct will be used through cabinet floor
using DBI-600A blower.
For left, right, below or rear exhaust: Allow at least 18" for transi-
tion and elbow or blower.
For left / right exhaust: a 30" deep cabinet is recommended to align
properly with DBI-600A blower. DBI-600A blower can be mounted
to rear cabinet wall or to a platform / frame (not provided) on the
base of the cabinet floor. (See DBI-600A blower instructions).
Note: DBI-600A blower can only attach to the front of the down-
draft.
Cabinet depths of 24" to 30" are required - depending on the
type of cooking appliance.
If using a Recirculating Kit, see "Plan the installation"
section of the installation instructions packaged with the
kit.
Below, Side or Rear Ducting Cutouts
/ 8 "
/ 8 "
5 - 7
5 - 7
c m
c m
. 9
. 9
( 1 4
( 1 4
Appliance
1 c
Cutout
( 5 .
"
"
2 1
2 1
)
)
c m
c m
. 3
. 3
( 5 3
( 5 3
4 "
. 2
( 1 0
10
Planning
)
)
2 "
m )
2 1
2 1
( 5 3
( 5 3
"
"
. 3
. 3
c m
c m
)
)
)
c m
2 4
2 4
- 3 /
- 3 /
( 6 2
( 6 2
4 "
4 "
. 9
. 9
c m
c m
)
)
4 "
( 1 0
. 2
c m
)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dli-e36asx

Table des Matières