7
Maintenance at expense/DiBO technicians
For further maintenance we advise to contact your DiBO distributor concerning
a maintenance contract. The maintenance applies to normal company
circumstances. At heavy circumstances you can communicate this so that can
be taken into account. Supplement documents:
• Control manual
• CE- certificate
• Electrical plans
Remarks: It is recommend the preventive maintenance to carry out by a
competent DiBO- service technician according to this maintenance diagram,
to be able to remain use the machine up to maximum and also to be able to
claim the guarantee conditions. To be able to guarantee a good and regular
maintenance, we advise the owner/user at strongest to make an appointment
with DiBO against reaching the given up company hours, concerning a
maintenance turn.
DESCRIPTION DAILY CONTROL
1
Frame
Check the frame in its entirety at loose bolts and/or cracks of the welds.
Keep the machine as much as possible clean to prevent act on dirt, water, oil
and messed fuel.
2
Valves + manometer
At an switched off machine, this means a halted engine, the manometer must
reflect 0 bar. At an maximum performing machine, this means operated at full
load working engine, the manometer can not indicate more than the maximum
pressure by DiBO indicated, for your machine. After operation and releasing
the gun can still remain a small pressure remainder present. The reflected value
of the manometer must be between 0-30 bar, the valves are then all right.
3
High pressure pump
Check the pump on loose connections, bolts, seals and leaks.Check regularly
the oil level of the pump. If the oil level has decreased too much or pollution
of oil is observed, should these be replaced before working further. Put the
machine on a horizontal base. The oil level must stand halfway the level glass.
Take at doubt the oil level stick separately, where the oil level must stand
between both mark lines. If pump oil gives a milky impression, frequently
indicates this on an internal leak as a result of which water touched oil there.
Immediately repair is necessary then.
4
High and low pressure part
Check the hoses, piping and connections on external damages and leaks.
If damaged or if leaks are present, these must be immediately replaced.
5
Spray tools
Check lances and guns on leaks, external damages and hair cracks. If damaged
or leaks these must be immediately replaced. Check the spray image of the
water jet, if these blows out to much you must replace the nozzle. Check
protective cap- nozzle on damages and replace if necessary. Check the thread
of the couplings on external damages. At damage let these replace without
delay.
6
Electrical part
Checks visible electric wiring and components (among other things switches)
on external visible damages. If damaged let replace the concerning parts.
DiBO 21
E N
S E R V I C E