Commissioning - Kessel Aqualift S 100 tronic Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
5

Commissioning

Check whether the steps explained in the chapter on assembly have been carried out correctly.
Clear any building waste from the tank if necessary.
Connect to the mains connection. Make the connection to the control unit as described in the instructions enclosed with
the control unit.
Connect the system to the power supply. If applicable, lift the float switch to check whether the submersible pump starts
up automatically.
With the connection of the connection cable(s) to the power supply, the system is ready for operation.
If installed, initialisation of the control unit starts automatically (separate instructions).
40 / 140
016-228_01

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aqualift s 200 tronic

Table des Matières