Starting operation
5
6
7
1

4.3 High-pressure hose and spray gun

1.
Screw the high-pressure hose (fig. 10, item 1)
onto the hose connection (2).
2.
Screw the spray gun (3) with selected tip onto the
high-pressure hose.
3.
Tighten the union nut on high-pressure hose so
that no coating material escapes.
3
1
2
32
All manuals and user guides at all-guides.com
g
g

4.4 Connection to the mains

Attention
Before connection to the mains, pay attention to the fact
that the mains voltage agrees with the information on the
3
makers' name plate on the rear of the unit.
The green control lamp will light up as soon as the mains
2
plug has been connected.
4
4.5 Cleaning preserving agent when
1.
2.
3.
4.
5.
6.
7.
8.
9.
4.6 Ventilate unit (hydraulic system) if the
1.
2.
3.
4.
5.
The connection must take place through
a correctly earthed two-pole and-earth
socket outlet.
starting-up of operation initially
Unit with suction system
Submerge suction pipe into a vessel filled with a
suitable cleaning agent
Unit with upper hopper
Fill suitable cleaning agent into the upper hopper.
Switch on the unit.
Turn the pressure regulation knob (fig. 11, item 1)
to the right as far as it will go.
Open the relief vale (2),
valve position k (circulation).
Wait until cleaning agent comes out at the return
hose.
Close the relief valve, valce position p (spraying).
Pull the trigger guard of the spray gun.
Spray cleaning agent out of the unit into an open
collection container.
2
1
sound of the inlet valve is not audible
Switch on the unit.
Turn pressure regulating knob (fig. 12, item 1)
three revolutions to the left.
Open the relief valve (2), valve position k
(circulation).
The hydraulic system is ventilated. Leave the unit
on for two to three minutes.
Then turn the pressure regulating knob (1) to the
right until stop.
Sound of the inlet valve is audible.
If not, repeat points 2 and 3.
Super Finish 21 • 23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Super finish 23

Table des Matières