3  Initial Setup and Start
Figure 3.8 LCS tool - Verification of country and grid code
8. The system now applies the selected grid code to the
SMA Inverter Manager and the discovered inverters.
Any inverter added at a later stage automatically
inherits the same grid code. Only one grid code is
possible per SMA Inverter Manager.
INFORMATION
It is essential to choose the correct grid code. The grid
code cannot be changed afterwards without
contacting SMA Solar Technology AG.
9. A green square identifies the commissioned inverters.
However, the inverters are not connected to grid
before a "Start" command is issued from the bar below
the top menu. See figure 3.9.